Shoring plan • temporary support • renovation • wall opening • foundation work

Temporary structural safety before demolition or alteration

Need a Shoring Plan for a Renovation or Structural Alteration?

If a load-bearing wall, beam, column or part of the foundation is being altered, removed or temporarily unloaded, a properly considered shoring plan may be critical for safe execution. Aboss provides temporary support concepts, structural advice and technical substantiation for renovations, wall openings, foundation work and other structural interventions.

  • Clear temporary support logic for demolition, alteration and phased execution.
  • Practical coordination between structural reasoning, drawings and contractor workflow.
  • Useful for site safety, risk reduction, insurability and technical clarity.

Fast start: send photos, approximate dimensions, the type of intervention, and any existing drawings or contractor sketches if available.

Shoring plan and temporary support concept by Aboss Bouwadvies
Aboss Bouwadvies: shoring plan, structural advice and practical support for safe execution.

Temporary Support, Shoring Plans and Structural Calculations

Temporary support is not an afterthought. In many renovation projects, the most vulnerable moment is the transition phase: before the permanent beam, column, lintel or foundation solution is fully in place. A shoring plan helps define how loads are temporarily carried during demolition, opening-up works, replacement of structural elements or sequencing of a more complex intervention.

This matters especially in existing buildings, where the actual construction may differ from archive drawings, hidden defects may be present and the consequences of a wrong site assumption can be severe. A technically grounded shoring plan reduces uncertainty and supports safer decision-making for both the client and the contractor.

Where temporary support is often needed

Wall openings and removal of load-bearing walls

When a structural wall is opened or removed, the loads above must be safely redirected. Temporary support may be required before the final beam or portal frame is installed and fully working.

Foundation repair and strengthening

During foundation work, parts of the building may need to be temporarily supported while the new or repaired foundation elements are introduced.

Replacement of beams, columns or structural elements

If a structural member is removed, altered or reinforced, temporary stability and controlled load transfer become essential.

Extensions, roof work and phased structural interventions

More complex projects often require a temporary structural strategy to bridge the period between demolition and the final structural configuration.

Why a shoring plan can be critical

Site safety

The primary reason is safety. Temporary support helps prevent local failure, settlement, cracking or more severe structural incidents during the work.

Protection of the existing building

A phased intervention changes the load path. Good planning helps protect the existing structure while the permanent solution is not yet active.

Clear contractor coordination

A contractor benefits from clarity about sequence, support locations and the structural reasoning behind the temporary setup.

Reduced execution risk

Preventing avoidable damage, delays and emergency improvisation on site can save significant cost and stress later in the project.

How Aboss approaches a shoring plan

1. Review of the planned intervention

We first assess what is being removed, weakened, replaced or temporarily unsupported, and how the existing building is likely to react.

2. Identification of structural risk points

We look at load paths, support conditions, sequencing, local vulnerability and any need for additional inspection or measurement.

3. Temporary support concept

We formulate the temporary support logic and, where required, combine it with calculations, structural notes or coordination with the permanent solution.

4. Alignment with execution

Where useful, we help align the structural reasoning with contractor sequencing so the site team can work with more clarity and less ambiguity.

Technical depth for existing buildings

Existing buildings rarely behave like textbook new-build structures. Historic modifications, undocumented alterations, uncertain material quality and partial hidden conditions all make renovation work more sensitive. That is why temporary support should not be treated as generic site improvisation. It should be linked to the actual structural behaviour of the building and the realistic execution order on site.

Aboss works at the interface of architecture, structural engineering and permit logic. This helps ensure that the proposed approach is not only technically defensible, but also practical in the context of renovation, contractor coordination and the broader building dossier.

Frequently Asked Questions

When do I need a shoring plan?

A shoring plan is often needed when a load-bearing element is temporarily removed, interrupted, replaced or weakened, especially during a wall opening, foundation repair, beam replacement or structural alteration.

Is this only relevant for permit-required work?

No. Even where a permit is not the main issue, temporary support can still be technically necessary for safe execution and reduction of structural risk.

Can you coordinate with my contractor?

Yes. Aboss can help align the structural logic, support strategy and phasing with the contractor, which often reduces confusion and site improvisation.

What is the difference between a structural calculation and a shoring plan?

A structural calculation usually supports the permanent structural solution. A shoring plan focuses on the temporary phase during demolition, alteration or installation.

Can this also apply to foundation work?

Yes. Foundation repair, underpinning or local structural interventions may require temporary support of the superstructure while the work is being carried out.

What do you need for a first assessment?

Photos, rough dimensions, a short description of the works, existing drawings if available and any contractor proposal are usually enough for a first technical review.

Need a Quick Assessment or Quotation?

Send us your photos, sketches, PDFs or archive drawings. We will review the situation and indicate the likely technical route for temporary support and structural coordination.